Transform Peel

Transform Peel
December 7, 2018 stephanie

Project Overview

Transform Peel will help future-proof food and water supplies and drive economic growth, by creating new industries and jobs, encouraging enterprise and providing sustainable sources of food and water as the population grows south of Perth.

Transform Peel is a 35 year development program comprising three main elements:

  • 1,000ha Peel Business Park
  • 28,000ha Peel Food Zone
  • Peel Integrated Water Initiative

The Project was engineered in response to several challenges and opportunities faced by the Peel region.

Challenges:

  • Significant expected population growth
  • Environmental pressures on our waterways
  • Insufficient supply of jobs and leakage of our workforce out of our region
  • High unemployment rate
  • Declining standards of living and high socio-economic disadvantage

Opportunities:

  • Peel’s proximity to the metropolitan region
  • Major food export opportunities
  • State food and nutrition security concerns
  • Requirement for a long-term home for Perth’s food industries
  • New technologies and IP commercialisation
  • Significant job creation
  • Alternative water supplies
  • Reduction in nutrient flows into the Peel Harvey Catchment

Its successful implementation will meet about one third of the employment needs of the Peel region by 2050, delivering over 33,100 jobs.

The project further focuses on diversification and innovation to disrupt and transition Peel’s economy from its population driven profile to a high performing traded economy.

The Transform Peel Project is the result of a successful partnership between the Shire of Murray, Peel Development Commission, LandCorp, Department of Water and Department of Primary Industries and Regional Development, and is proudly supported by the State Government through its Royalties for Regions scheme.

Peel Business Park

Peel Business Park will comprise five precincts:

  • The Agri-innovation Precinct focusing on innovative, high-quality food production and processing, which is not climate dependent and designed to allow for stronger connections between agricultural and logistics chains, to build critical capacity, business capability and export readiness.
  • The General Industrial Precinct will be home to a wide-range of industrial, transport and logistics, and warehouse uses.
  • The Light Industrial Precinct will feature a network of well-connected, flexible lots to meet differing business needs.
  • Highly accessible, well positioned lots will suit the demands of businesses in the Commercial Precinct.
  • The Renewable Energy Precinct offers unique power requirements, with both mains and renewable energy options at negotiable rates, feeding back into one of the largest industrial micro-grids in Australia.

The business park also includes plans for a campus style technology park for research, development and training organisations. The Peel workforce initiative, delivered by Peel Development Commission, will tap into the large, local workforce of skilled employees that is readily available.

Once fully completed, the Peel Business Park is expected to create around 2,000 local jobs and inject around $1 billion into the State’s economy each year.

During construction, the park is expected to create over 300 jobs with a further 160 permanent operational workforce jobs for the Peel region once the first stage is fully operational.

The Park is a flagship project of the newly formed Industrial Land Authority, and is being delivered by LandCorp, Peel Development Commission and the Shire of Murray.

Essential trunk infrastructure is being funded by the State Government’s Royalties for Regions scheme.

The renewable energy micro-grid will be established as part of stage one development and is expected to be one of the largest for an industrial development in Australia.

For further information visit landcorp.com.au/peelbusinesspark.

Shire Owned Common Use Facilities

The Shire of Murray is on the brink of securing $21.75 million through the Commonwealth Government’s Regional Growth Fund toward the purchase of 2.5ha of land within the Agri-Innovation Precinct and the construction of common-use infrastructure including:

  • Research facilities
  • Cold storage
  • Warehousing
  • Packaging and distribution
  • Incubator space

An Enterprise Development Support Program will also be established to assist with entrepreneurial training and access to export markets and development finance.

These common-use facilities are set to stimulate the development of the wider Agri-Innovation Precinct, to incorporate high technology food production, value-added processing and university-led research and development, to de-risk investment and encourage significant local and international buy-in.

The Precinct is a catalyst for the conditioning of the next generation into a highly skilled workforce to satisfy job requirements and is of momentous benefit to Murray ratepayers as the common-use facilities within the Precinct will be a Shire of Murray owned asset that will help secure long-term sustainability for the district.

Agreements are in-place with Fund Singapore and Murdoch University, with the migration of additional smart businesses anticipated pending the successful outcome of the full business case review.

Approximately 186 direct and indirect jobs will be created through the construction of the common-use facilities, with the creation of a further 88 operational jobs.

The creation of new jobs is critical for addressing unemployment rates and the resultant employment needs of the anticipated population growth for Murray and the Peel region, and the Peel Agri-Innovation Precinct is a significant step towards building a strong and resilient local and regional economy.

The success of this project to date has been achieved through the collaboration of all three levels of government including the Commonwealth Government and Federal Member for Canning Mr. Andrew Hastie MP, the Peel Development Commission, LandCorp and Murray’s neighbouring local governments.

Managed Aquifer Recharge Feasibility Study Program

The Shire of Murray in partnership with Department of Water and Environmental Regulation, secured funding under the Federal Government’s National Water Infrastructure Development program for a two year feasibility study into a Managed Aquifer Recharge scheme within the Peel Business Park in Nambeelup.

Manage Aquifer Recharge uses the natural groundwater aquifer system to store water during the wetter winter months for reuse over the dry summer period.

The Study was intended to assess the aquifer properties, water quality and potential reaction with source waters, for storage into the deep Cattamarra aquifer, 250 metres below the surface. The groundwater is then pumped back to the surface for future reuse by industry, recreational open space or agricultural activity in the Peel Food Zone.

Darling Downs Drilling was successful in a tender process for the drilling and construction of a production and monitoring bore and pump testing.

Drilling of the main exploratory bore commenced in early June 2017 with a second monitoring bore installed in late September.

Wallbridge Gilbert Aztec was appointed to oversee the water testing program and hydro geochemical modelling and risk assessment program. The initial results of the feasibility study which were made available in February 2018, indicated promising results and provided a better understanding of the aquifer system and its potential to secure ‘fit for purpose’ water supply for the district.

The conclusions presented in the final feasibility report indicate that it is appropriate to progress to a more specific trial to confirm system operability.

Prior to the commencement of the next trial, it is likely that an economic feasibility assessment will be completed to gain a better understanding of the costs required to establish a full water supply scheme, ongoing operational costs and to identify end users.

Request Further Information
Processing...
Thank you! Your subscription has been confirmed. You'll hear from us soon.
Subscribe to our monthly eNewsletter
ErrorHere