Roads and Drains
Introductory image (480x120) and paragraph:
Main content:
Scheduled Roadworks
Please be aware that the dates specified are estimates and are subject to confirmation, circumstances and weather permitting.
Maintenance Grading
Grading edges in the West Pinjarra and Coolup areas.
Mills Road
Culvert Construction has commenced. Side Track in place.
Paterson Road
Construction Completed. Reticulation to be fixed.
Old Bunbury Road
Re-construction has commenced.
Future Civil Projects
Fishermans Road Reconstruction
Road Closures
Event: Australia Time Trials Association
Location: Hopelands Road
Date: 4 March 2012
Road Management
State Owned Main Roads
Please contact Main Roads Western Australia for traffic enquiries regarding the following roads:
-
Pinjarra Road
-
South Western Highway (includes George Street and McLarty Road)
-
Pinjarra-Williams Road (includes McLarty Road)
Local Roads
Traffic enquiries regarding all other roads within the Shire should be addressed to the Shire of Murray.
Traffic Signals/Signalised Pedestrian Crossing
Enquiries regarding all traffic signals and signalised pedestrian crossings should be referred to Main Roads Western Australia.
Regulatory Road signs
Regulatory signage, which incorporates stop, giveway, no u-turn, no left turn, no right turn and speed signs are the responsibility of Main Roads Western Australia. Enquiries regarding regulatory signage within the Shire should be referred to Main Roads, Western Australia.
Drainage
The Shire of Murray provides and maintains all stormwater drainage infrastructures within the Shire. This includes the construction of opened drains and piped drainage systems which transport the water to sumps, bubble-up structures and swales.
The Shire carries out regular maintenance including clearing blocked drains, improving and replacing old drainage infrastructure.
Please report any drainage maintenance or flooding enquiries to the Shire’s Customer Services team (click here)
Information and Forms Rack |

